Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Please reach us at info@sambren.com if you cannot find an answer to your question.
The Flexibuster™ is currently available to Canada, UK, EU, USA, Australia, and Indian customers. For a quotation, please click here. From Order to shipping usually takes about three months.
Buying a unit eliminates a waste disposal cost for organic waste and creates a source of energy which can be used on site to power various items (e.g. hot water heater, tractor, generator).
The payback time can vary considerably based on the type of waste used in the system. We have estimated the unit will payback within 2-6 years, when using the grants available in Canada, the UK, USA, and France. We cannot however guarantee the energy output due to the variety of feedstock energy values.
One cubic meter of waste creates one household unit of electricity.
The Flexibuster™ requires a check-up after six months of use, and then an annual maintenance visit.
The units are manufactured and assembled in the UK, Portugal and the USA depending on the module and the end user site location.